One more thing that I cross out from the list “things to do”! The battery box is already welded, painted and with all accessories installed on the door. Let’s see what these accessories are about: -The box has two LEDs on the door, one green and one red which indicate the status of the controller (on, off, over-voltage, high temperature, …
Swingarm finally welded
I’ve finally welded the aluminum swingarm and the batteries box! It has been a long journey… As I was expecting, they were much more difficult to weld than the steel parts. The biggest headache was to weld the joints between the aluminum extrusions and the machined parts. Because the thicknesses were so different, machined parts (like the shock absorber lug) …
Caja de las baterias
Como les dije en el anterior post, ya tengo en mi poder todas las piezas para comenzar a soldar la caja de las baterías. Esta irá colgada del chasis mediante tornillos y albergará, además del pack de baterías, todos los componentes electrónicos de la moto, como son controladora, BMS, conversores dc/dc, contactor, relés, etc. La caja tendrá una puerta lateral …
Chasis DCH1 soldado
Las dos estructuras tubulares del chasis por fin están soldadas. Ha costado y mucho, pero ya están listas para ser pintadas y ensambladas. En un principio mi idea era buscar un taller para que me soldaran tanto el chasis como la caja de las baterías y el basculante. Pero la falta de interés de algunos talleres y la poca profesionalidad …